Interactive Checklist

ADU Document Checklist

Track every document you need to file for your NYC ADU permit. Check items off as you gather them to track your progress.

0 of 20 documents0%

Phase 1: Pre-Filing

Gather these foundational documents before engaging your design professional.

0/6

Phase 2: Design & Engineering

Your architect and engineers produce these technical documents.

0/5

Phase 3: Zoning & Environmental

Zoning analysis and environmental clearances needed before filing.

0/5

Phase 4: DOB Filing

Final assembly and submission through the DOB NOW portal.

0/4

Using a Pre-Approved Plan? You still need site-specific documents.

Even with an HPD pre-approved plan, you are still required to provide site-specific documents including: utility connections, zoning compliance analysis for your specific lot, foundation design adapted to your soil conditions, and DEP sewer certification. The pre-approved plan covers the architectural design only.

Need help gathering these documents?

Our ADU specialists can guide you through every document and connect you with architects, engineers, and surveyors.